Realizacje

  • The Campus of the University of Białystok, Institute of Biology and Chemistry – installation of gas systems for: acetylene, carbon dioxide, argon, liquid nitrogen, gaseous nitrogen, hydrogen and helium for the needs of research laboratories
  • Educational-Research Nanotechnology Center in Szczecin – installation of technical gas systems for: nitrogen, carbon dioxide and oxygen, compressed air, vacuum, inert gas leakage system.
  • “Energetyka” Sp. z o.o. in Lubin – upgrading the pipework for dryers type H5900W w 3 complete sets of air dryer stations installed in EC-3 Department Głogów
  • Dolnośląska Farmacja in Wrocław – upgrading the laboratory gas system existing in the newly built research-scientific-educational center consisting in installing laboratory gas systems, including: – oxygen, helium, nitrogen, nitrous oxide, argon, carbon dioxide systems – compressed air system – vacuum system
  • EnergiaPro Branch in Legnica – upgrading the compressor station supplying the 110 kV distribution station with compressed air in 400/110 kV station in Czarna
  • Nicolaus Copernicus University in Toruń – Building an Interdisciplinary Modern Technology Center UMK in Toruń, installation of helium, technical helium, nitrogen, technical nitrogen, compressed air and vacuum systems of copper pipes and of 316L acid-resistant steel
  • Wrocław Research Center EIT+ Sp. z o.o. – Building the Lower Silesia Center for Materials and Biomaterials of the Wrocław Research Center EIT+ – Building 1 part “B” and “C” installation of the following gases: argon, nitrogen, helium, acetylene, compressed air, including the delivery of devices and “as is” documentation
  • Wrocław University of Environmental and Life Sciences in Wrocław – installation of technical gas system – laboratory gases for the Department of Chemistry and Physics
  • Institute of Aviation based in Warsaw – building a steel DN400 compressed air pipeline with an expected maximum air flow of 35 kg/s and a pressure of 6 atm. to supply the aerodynamic tunnel for research purposes.
  • NGK Ceramics Polska Sp. z o.o. Gliwice – installation of technical gases including NO2, NH3, O2, N2, NO from cut-off valves built under the canopy
  • Central Mines Rescue Station S.A. in Bytom – developing a design and installing gas systems for He, Ar, N2 , synthetic air, low pressure air, high pressure air in the lab part of the building
  • LOTOS S.A. in Gdańsk – nitrogen generator including liquid nitrogen gasification station
  • Air Liquide ALKAT Sp. z o.o. Dąbrowa Górnicza – Extension of medical oxygen filling station
  • Hospital no. 1 Tuchów – installation of medical gases: oxygen, nitrous oxide and compressed air
  • Zakład Maszyn Górniczych Glinik sp. z o. o. – upgrading the ammonia pressure reducing station
  • Bulten Bielsko – Biała – installation of ammonia and propane gas systems including pressure reducing stations
  • Clinical Hospital Ceglana in Katowice – installation of medical gas systems for O2, N2O, Air, Vac
  • Private Ophthalmological Hospital “Weiss Klinik” Chorzów – adjusting the existing compressed air system to meet valid legal regulations and according to PN-EN ISO 7396-1 standard
  • Bosch – compressed air system and upgrading the compressor station
  • Chassis Brakes International Poland – building the system including 220 bar compressor station.
  • Electrolux Świdnica – technical gas systems for: acetylene, oxygen, methane, mixture of methane with nitrogen, mixture of methane with propane, mixture of methane with hydrogen, mixture of methane with carbon dioxide, butane, propane, propylene, mixture of propane with butane, nitrogen
  • Electrolux Siewierz – 45 bar compressed air system
  • Unilever Katowice – CO2 150 bar system
  • Fiat Polska Bielsko – Biała – acetylene piping system including acetylene pressure reducing station
  • GEA Polska Sp. z o.o. Świebodzice – oxygen and acetylene system
  • WATT Sosnowiec – oxygen, acetylene and nitrogen systems
  • BATERPOL S.A. Katowice – Installing a metering point at the hall in front of the burners for vat soaking. 50m3/h, installing gas heating radiators
  • OML MORANDO Dynamic Technologies – detection at a gas furnace in the production hall
  • Silesian University of Technology in Gliwice – delivery, installation and startup of compressed air distribution network
  • Centrum Badań i Dozoru Górnictwa Podziemnego (Center for Research and Supervision of Underground Mining) Sp. z o.o. Lędziny – installation of gas systems for He, Ar, compressed air, O2, O2 50 bar, C2H2 , N2 including a canopy, extension of O2, N2, AIR systems
  • Science and Technology Park in Suwałki – installing technical gas systems (vacuum, compressed air, oxygen and acetylene) in B building
  • Huta Pokój S.A. – installing propane system
  • SARPI Dąbrowa Górnicza Sp. z o.o. – installing medium-pressure manifold
  • Silesian University branch in Chorzów – delivery of a liquid nitrogen tank
  • REMGAZ Pszczyna – installation of a ramp for filling oxygen and moving the ramp for filling argon
  • Provincial Environmental Protection Inspectorate (WIOŚ) in Gdańsk – installation of gas systems: acetylene, argon, nitrogen, helium, synthetic air, hydrogen.
  • KGHM Polska Miedź S.A. – delivery and installation of 2.5 m3 compressed air tank Południowy Koncern Węglowy – installation of laboratory gas systems
  • Gegenbauer Polska Sp. z o.o. Kraków – installation of natural gas pipeline system